This shed door had outlived its functional life and a client wanted it replaced. I asked “Do you want to just get it done or do it right?”

They picked the right option.

    • FauxPseudo @lemmy.worldOP
      link
      fedilink
      arrow-up
      9
      ·
      9 days ago

      It took me a very long time to do this because I every board on that needed three coats of clear coat. I have a limited workspace and a garage with no climate control. You can’t apply clear coat if the temperature drops below 55 and I was having to run a space heater the whole time. Plus they’re going to need time to financial recover from this.